Choosing a lead-safe contractor
Alameda County’s Healthy Homes Department says most projects that disturb paint in a pre-1978 home need an EPA Lead-Safe Certified renovator, and it points owners to the EPA firm search and CDPH’s lookup of certified professionals. Ask to see the firm’s EPA certificate and the renovator’s training certificate, and get the scope in writing.
The department also says removing paint without containment violates Title 17, and it suggests an independent dust test after work if you are concerned. Its public information line is (510) 567-8280.
Where California renovation rules stand
California is not one of the states that run their own EPA renovation program, so renovation firms here apply to the EPA for certification. CDPH’s renovation page reports regulations tied to SB 1076 in preparation and shows no adopted rule, so no state renovation certification exists yet.
Abatement is separate and stays with CDPH. Work meant to last 20 years or more needs certified workers and a written plan. If a remodel turns into that kind of job, the rules change with it.
What affects the cost
Containment adds labor and materials to any job, and testing first can shrink it by showing what does not carry lead. Larger remodels cost more to contain, a house kept occupied needs more careful phasing, and the cleaning check at the end adds time.
Homeowners planning new windows will find the details in lead paint window and door work. For a project that should begin with a paint test, lead paint inspection and testing explains how that works, and you can reach every other page from Livermore Lead Paint Removal.